Problems
Detailed Problem Access PDF Print E-mail
Monday, 14 September 2009

Full detailed problems are NOW available to registered members on the national website! If you have not already done so, purchase your membership now, so your students can start working on the problems. If you have a membership enter your membership number in the page linked above, and click on "Forms & Problems" once you are logged in.

 
Problem 1 PDF Print E-mail
Tuesday, 03 April 2007

To contact the Problem 1 Problem Captain please use this email address: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Clarifications can be found by clicking here.

Team required list: Make up your own, or use this one (click here).

Problem 1 is the Vehicle problem. Every alternate year, we have a ride-on vehicle problem or a model vehicle problem. For 2010, we have a ride-on vehicle problem.

Problem 1: Nature Trail'R
Divisions I, II, III , & IV
This problem requires teams to design, build and drive a human-powered vehicle and camper that will go on a camping trip. When the vehicle arrives at the Campground, the camper will be disconnected and the vehicle will travel on a team-created Nature Trail. On the Nature Trail, the vehicle will overcome an obstacle, clean up the environment, encounter wildlife, and undergo a repair. The performance will include a character that is in or near the camper that explains the experience as part of its role. Sponsored by NASA.
Cost limit: $145 USD.
NASA Logo Sponsored by NASA.

 
Problem 2 PDF Print E-mail
Tuesday, 03 April 2007

To contact the Problem 2 Problem Captain please use this email address: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Clarifications can be found by clicking here.

Team required list: Make up your own, or use this one (click here).

Problem 2 is the Technical problem.

Problem 2: Return to The Gift of Flight
Divisions I, II, & III
Teams will make and operate a series of aircraft that will complete a variety of flight plans. The flight plans include flying straight, making a target spin, traveling slowly, dropping something into a target, touching down and taking off, and a mass launch of multiple aircraft. The aircraft in the solution will be made of a variety of materials and will have a variety of power sources. The testing of the aircraft will be presented in a team-created performance that will include a character that serves as a creative "air traffic controller."
Cost limit: $145 USD.

 
Problem 3 PDF Print E-mail
Tuesday, 03 April 2007

To contact the Problem 3 Problem Captain please use this email address: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Clarifications can be found by clicking here.

Team required list: Make up your own, or use this one (click here).

Problem 3 is the Classics problem.



Problem 3: Discovered Treasures
Divisions I, II, III & IV
Teams will create and present an original performance that includes the portrayal of the discovery of two archaeological treasures. One portrayal will be a team-created version of the discovery of an actual historical treasure. The other portrayal will be the team's depiction of a modern sculpture or structure that exists today but is discovered in the future. The performance will include an artistic representation of the two discovered treasures and characters that are part of the discovery teams.
Cost limit: $125 USD.

 
Problem 4 PDF Print E-mail
Tuesday, 03 April 2007

To contact the Problem 4 Problem Captain please use this email address: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Clarifications can be found by clicking here.

Resources:

HairyLunch's Creative Problem Solving Page

Vermont's Balsa Guide

Problem 4 is the Structure problem.

Problem 4: Column Structure
Divisions I, II, III & IV
The problem is to design and build balsa wood columns that will function together to balance and support as much weight as possible. The columns must not be connected to each other in any way. The team will test its Column Structure by placing weights onto it. The team will add weight until its Column Structure breaks or time ends. Bonus score will be awarded for the number of columns used. The team will incorporate the testing of its columns in an original team-created performance.
Cost limit: $145 USD.

 
Joomla School Template by Joomlashack
School Joomla Templates and Joomla Tutorials